Allied Telesis AT-GS950/16-10 Switch User Manual


 
AT-GS950/16 and AT-GS950/24 Gigabit Ethernet Smart Switches Installation Guide
35
4. Slide the transceiver into the SFP slot until it clicks into place.
Figure 12. Inserting the SFP
5. Verify that the handle on the transceiver is in the upright position, as
shown in Figure 13. This secures the transceiver and prevents it from
being dislodged from the slot.
Figure 13. Positioning the SFP Handle in the Upright Position
6. Repeat steps 2 through 5 to install another SFP transceiver.
Note
SFP transceivers are dust sensitive. When a fiber optic cable is not
installed, or when you store the SFP, always keep the plug in the
optical bores. When you do remove the plug, keep it for future use.
738
1300
SFP Transceiver
Handle