Allied Telesis AT-EN646 Network Card User Manual


 
AT-iMG646xx Series Intelligent Multiservice Gateway and AT-EN646 Enclosure Installation Guide
Section I: Outdoor Installation 37
4. Insert a UV-rated wire tie (not provided) through the slots at the bottom
of the entrance as shown in Figure 8.
Figure 8. Inserting the Wire Tie
5. Remove the grommet from the fiber optic drop cable and ground wire
entrance.
6. Strip the fiber jacket, per the cable manufacturer’s instructions, to 1.5
in. beyond the grommet slot where the cable will be coming into the
enclosure exposing 41 in. (104.14 cm) of buffer tube.
7. Locate the drop cable clamp on the grounding plate (see Figure 5 on
page 35) and remove the Kepnuts, washers, and bar from the posts.
8. Locate the strength member clamp (see Figure 5 on page 35) on the
grounding plate and loosen the Kepnuts.
9. Locate the aramid strand and trim it 6 in. (15.24 cm) from the
enclosure entrance.
10. Cut the cable strength member off 2.5 in. from the entrance to the
enclosure.
11. Position the cable so that the strength members go under the strength
member clamp, the jacket is about .25 in. beyond the drop cable clamp
posts, and the buffer tube is free, as shown in Figure 9.
Figure 9. Positioning the Cable
844
1186