Allied Telesis AT-SBX31GT24 Switch User Manual


 
153
Chapter 7
Powering On the Chassis
This chapter describes how to power on the chassis, monitor the
initialization process, and confirm the operational status of the
components. The chapter contains the following sections:
“Verifying the Installation” on page 154
“Powering On the AT-SBxPWRSYS1 AC Power Supply” on page 155
“Powering on the AT-SBxPWRPOE1 AC Power Supply” on page 158
“Powering On the AT-SBxPWRSYS1 DC System Power Supply” on
page 161
“Monitoring the Initialization Process” on page 184