APC 150 Power Supply User Manual


 
13150/175kw Modular PDU Installation
Install the Communication Cable
1
Connect the CAT-5 cable for
StruxureWare Central or your local area
network to the RJ45 connection coupling
on top of the PDU.
2
Inside the PDU enclosure, a second CAT-
5 cable is connected to the other side of
RJ45 coupling.
3
The other end of the internal cable is
plugged into the RJ-45 port on the panel
cover of the controller located at the
bottom of the unit.
pdx
0837a
pdx0838a
Front
1
2
3