APC 60-80kW Power Supply User Manual


 
990-4051
Installation Guide APC Silcon 60-80kW 400V UPS 3
Contents
1.0 Introduction 5
1.1 Tools and Equipment 5
2.0 Unpacking 6
3.0 Installation 8
3.1 Requirements on Site 8
3.1.1 Cabinet Dimensions H*xWxD - 1400xWx800 [mm]. Width as in below table: 8
3.2 Footprint 9
3.2.1 800mm Cabinet for 60-80kW UPS 9
4.0 External Connection 10
4.1 Connecting the UPS 10
4.2 System Integration Interface 12
4.2.1 Connections 13
4.3 Parallel Board 14
4.4 Communication Interface Board 17
4.4.1 Connections 17
4.5 Connecting of APC Silcon Tripel Chassis 18
4.6 APC Silcon Triple Chassis 19
4.6.1 Safety Warnings 19
4.6.2 Product Description 19
4.6.3 Installing Management Peripherals 20
4.6.4 Powering the APC Silcon Triple Chassis 22
4.6.5 Troubleshooting 23
4.6.6 Product Specifications 24
4.7 APC Silcon Battery Cabinets 27
4.7.1 APC Silcon Battery Cabinets 28
4.8 Battery Breaker Box/Fuse-box 30
4.8.1 Battery Breaker Box 31
4.8.2 Battery Breaker Box Connection Diagram 32
4.8.3 Fuse-box 33
4.8.4 Fuse-box Connection Diagram 34
4.8.5 UPS with External Battery in Battery Breaker Box/Fuse-box Configuration 35
5.0 Programming Parameters 36
5.1 Parameters 36
5.1.1 Programming Keys 37
5.1.2 Programming Example - Switch to Bypass Operation 38
5.2 System Configuration 38
5.2.1 Programming Example - Change Charge Voltage to 446 40
5.2.2 Programming Example - Change to Output Isolation Transformer available 41
5.3 Programming Parameters for Advanced Parallel Operation 42
5.3.1 Description of Settings 42
5.3.2 Programming example 43
5.4 Battery Monitor 43
5.4.1 Installation of new batteries 43
6.0 Options/Accessories 44
6.1 Service Bypass Panel for Single Operation 44
6.1.1 Wiring up UPS with SBP in TN-C-S Network 46
6.1.2 Wiring up UPS with SBP in TN-S Network 46
6.1.3 Operating The External Service Bypass Switch 47
6.2 Service Bypass Panel for Parallel Redundant Operation 49
6.2.1 Two Parallel Systems with Service Bypass Panel 50
6.2.2 Parallel/Redundant Operation with Service Bypass Panel and External Battery
via MCCB 51
6.2.3 Operating External Service Bypass Switch for Parallel Systems 52
6.2.4 Isolating One UPS for Service/Maintenance 56
6.2.5 Switching Back to Normal Parallel/Redundant Operation 57
6.3 Intersystem Synchronization Unit 58
6.4 Relay Board 59