APC 990-2233A Power Supply User Manual


 
14 Smart-UPS RT 2400/3000 VA Tower/Rack-Mount UPS User Manual
Storage, Maintenance, Transport, and Service
1. Install the replacement battery modules in the UPS.
a. Install the bottom and top battery modules.
b. Connect the battery modules .
c. Push in the battery connectors .
d. Lift up the battery cover and install the screws .
e. Install the front bezel !.
Transporting the UPS to Another Location
Always DISCONNECT the Battery(s) before shipping to be in compliance with U.S. Department of
Transportation (DOT) regulations. The battery(s) MUST remain in the UPS.
Perform these steps before transporting the UPS to another location.
1. Shut down and disconnect any equipment attached to the UPS.
2. Shut down and disconnect the UPS from the utility or power supply.
3. Unplug the battery connectors. Refer to step 1 on page 12 for additional information.

!