APC AP9630 Network Card User Manual


 
Installation Manual
19
Installing cards in an expansion chassis
Install the lowest-priority cards in any available card slots in the UPS, and then
use an expansion chassis for remaining higher-priority cards. In a Triple
Expansion Chassis:
• Install each card, starting with the lowest priority (see “Before you start”
on page 18) in the lowest-numbered slot.
• If you are installing a Network Management Card, install it in slot 3,
even if you are leaving another slot empty.
Installing cards in expansion chassis set up serially
If you have increased your management card capacity by connecting multiple
expansion chassis serially (in a cascading setup), install the Network
Management Card in the highest-numbered slot, and the Out-of-Band
Management Card in the second-highest-numbered slot of the chassis installed
farthest from the UPS.
Warning: Do not attach more than two Network Management
Cards or one Building Management Integration Card to a UPS.
If the Network Management Card is pre-installed in the UPS, refer instead to
“When a management card has been pre-installed.” on page 20
Installing cards in a Symmetra UPS
If you are installing a Network Management Card without an attached
expansion chassis, install that card in the highest numbered slot, even if you are
leaving other slots empty. If you are using an expansion chassis, see “Installing
cards in an expansion chassis” on page 19.