CSI SECTION 16611 STATIC UNINTERRUPTIBLE SYSTEM
CSI SECTION 16611 STATIC UNINTERRUPTIBLE SYSTEM
F. External Service Bypass Panel (SBP): The maintenance service bypass cabinet shall
provide power to the critical load bus from the bypass source, during times where
maintenance or service of the UPS frame is required or when removal of the frame is
desired. The SBP shall provide a mechanical means of complete isolation of the UPS
from the electrical wiring of the installation. The SBP shall be constructed in a free-
standing, rack mounted or wall-mounted NEMA 1 enclosure unless otherwise stated in
this specification. It shall be designed for either three phase input or single phase input
with a “ no break” transfer between bypass and UPS power.
1.4 SUBMITTALS
A. Proposal Submittals:
1. As bid system bill of materials.
2. Product catalog sheets or equipment brochures.
3. Product guide specifications.
4. System single-line operation diagram.
5. Installation information, including weights and dimensions.
6. Information about terminal locations for power and control connections.
B. Delivery Submittals:
1. Installation manual, which includes instructions for storage, handling,
examination, preparation, installation, and start-up of UPS.
2. User manual, which includes operating instructions.
PART 2 – PRODUCT
2.1 DESIGN REQUIREMENTS
A. The UPS shall be sized for initial capacity of _____ kVA and _____ kW load.
B. The UPS shall be scalable to final capacity of _____ kVA and _____ kW load.
C. The UPS battery shall be sized for _____ kVA at a Power Factor of_____ for _____
minutes.