7Symmetra MW II 1200 kW 3 x 400/230 V Installation - 990-1979E-001
AC and PE cable connections
Note: No drilling or cutting should take place over the top of the UPS.
~~
UPS Summar
y
Normal
L1 IN
L1 OUT
L2 IN
L2 OUT
L3 IN
L3 OUT
N
For AC and PE
grommets
For AC and
PE
grommets
For battery
grommets
Top view of
top cover