ATEN Technology CL-1216 Switch User Manual


 
CL-1208 / CL-1216 User Manual
14
5. Power up the installation according to the following procedure:
a) Power on the First Station (CL-1208 or CL-1216) and wait a few
seconds for the unit to ascertain its Station ID.
b) Plug in the power adapters for each daisy chained Station on the
installation in turn (Second Station, then Third Station, etc.). Each
ACS-1208A / ACS-1216A has a LED display on its front panel to
indicate its Station ID (the Station ID for the First Stage unit is 01, the
ID for the Second Stage unit is 02, the ID for the Third Stage unit is 03,
etc.). In each case, wait for the Station ID to be ascertained and
displayed on the Station ID LED before plugging in the next Station.
c) After all the Stations are up, power on the computers.
cl12816_v2.book Page 14 Thursday, March 23, 2006 2:21 PM