Atlantis Land Rack Gigabit Switch Layer 2 Switch User Manual


 
5
U
NPACKING AND
I
NSTALLATION
This chapter provides unpacking and installation information for the
Switch. To avoid causing any damage to the Switch, we recommend
that you read this chapter carefully before starting installation.
Unpacking
Open the shipping carton of the Switch and carefully unpack the items
inside. The carton should contain the following items:
The Smart Gigabit Ethernet Switch
One AC power cord, suitable for your area’s electrical power
connections
Four rubber pads to be used for shock cushioning
Screws and two mounting brackets
User’s Guide
Diskette for Manageable/Smart function user’s guide
Console Cable: RS232 9pin (male) to 9pin (male)
If any item is found missing or damaged, please contact your local
reseller for replacement.