Avocent 2000 Switch User Manual


 
5
CHAPTER
2
Installation
Getting Started
Before installing your AutoView switch, refer to the following list to ensure you have all items that
shipped with the AutoView switch, as well as other items necessary for proper installation.
Supplied with the AutoView switch
Power cord
One null modem serial cable
Rack mounting kit
AutoView 1400/1500/2000 Installer/User Guide
AutoView 1400/1500/2000 Quick Installation Guide
Additional items needed
One IAC or AVRIQ module and CAT 5 cabling per attached server or switch
Rack Mounting Your AutoView Switch
Your AutoView switch may be rack mounted using the brackets supplied in your rack mounting kit.
Before installing the switch and other components in the rack cabinet (if not already installed),
stabilize the rack in a permanent location. Install your equipment starting at the bottom of the rack
cabinet, then work to the top.