B&K 1785B Power Supply User Manual


 
33
3. Program setting
6.3.4. GO/NG Test Function
Program:
Right-click on the Program area, the program
tools (Append a line, Insert a line, Delete a line, Delete
Select etc.) will appear on the window. Click the tools to
program the steps.
Double-click on each value to change them from key board
as you desired. Also you can change the time unit
(hour/minute/second) by clicking on “Sec”.
After programming, you can select a run mode for your
program. (Run m
ode includes Once, Repeat and Custom).
Click “Run” button to send the program settings to the power
supply. The power supply’s output will respond to the
program.
Click “Stop” button to stop sending the program settings to
the power supply. The power supply state will return to the
state before the program running.
Click “Chart” to show the voltage and current chart of the
program.
You can do some analysis on the chart or print the chart.
The chart is as follows:
GO/NG is an auto test function, to test if the EUT
(equipment under test) can meet the specification. To use
this function, follow up the steps below:
1. Right-click on the window, the edit tools (Append a line,
Insert a line, Delete a line, Delete Select etc.) will
appear on the window. Use the edit tools to edit the test
steps.
2. To set the Voltage, Max Amps, Min Amps and Delay
time according to the specifications of the EUT.
3. Click the Run button to start the test. If the Real Amps of
all steps are in the range of Min Amps to Max Amps,
then the EUT will pass the test, the Pass window will
appear.
4. If there is a Real Amps beyond the range in any step,
the EUT will not pass the test.