RAID Subsystem DVA-08K | Installation Manual Subsystem Maintenance | en 49
Bosch Security Systems F.01U.027.797 | V2 | 2008.08
7. Insert the new PSU module into the subsystem: Once the previously removed cooling
module has been installed, insert the new PSU module into the subsystem. Make sure the
extraction lever is in its downright position so that the saddle notches on the lower edges
of the handle can lock on to the edge metal brackets along the chassis inner walls. Push
the PSU into the slot and pull the handle upwards to secure the module.
8. Reinsert the retention screw: If the PSU module is properly installed, the back end of the
module should be aligned with the enclosure’s rear panel. To firmly secure the PSUs into
place, reinsert the retention screw.
9. Reconnect the power cord and turn the power on: Plug the power cord into the socket on
the PSU module and turn the PSU module power switch on.