Cabletron Systems 7C04 Workgroup Switch User Manual


 
2-1
CHAPTER 2
INSTALLATION
The
7C04 Chassis can be used as a stand-alone chassis or rack
mounted in a standard 19-inch equipment rack provided there is
sufficient space surrounding the chassis for cooling. This chapter
provides detailed information for unpacking and setting up the
chassis, as well as installing and removing the chassis’ power
supply module. You will not need any special tools or equipment;
however, the Site Guidelines detailed in Chapter 1 must be
followed.
2.1 UNPACKING THE 7C04 CHASSIS
Unpack the 7C04 Chassis by using the following steps:
1. Carefully remove the chassis from the shipping box. (Save the
shipping box and packing materials in the event the chassis
must be reshipped.)
2. Slide the two foam end caps off the chassis, and remove the
plastic bag. Set the chassis aside.
3. Remove the accessory package and verify that it contains two
mounting brackets.
4. Examine the chassis (and brackets) and check for damage. If
damage exists, contact Cabletron Systems Technical Support.