1
1
Topspin 90 Quick Start
This document describes the basic steps required to install and configure the Topspin 90 system.
For more detailed information about the Topspin 90 server switch, we recommend that you have the
Topspin 90 Hardware Guide available.
• “Prepare the Site” on page 1
• “Install the Topspin 90 in an Equipment Rack” on page 2
• “Install Expansion Modules (Optional)” on page 5
• “Cable the Switch” on page 5
• “Configure Basic Connectivity” on page 6
• “Connect and Configure InfiniBand Hosts” on page 8
• “Install the Element Manager (GUI)” on page 10
• “Launch Chassis Manager” on page 11
• “Configure Additional Settings” on page 12
• “(Optional) Configure the Ethernet Gateway” on page 13
• “Configure the Fibre Channel Gateway (Optional)” on page 15
Prepare the Site
1. Read the cautionary statements in “Safety Information” on page v.
2. Unpack the Topspin 90 package, using the packing list provided.
3. Register the Topspin system online. Go to http://topspin.com/support/
.
4. Prepare a management workstation, such as a PC or laptop running a terminal program, and a
straight-through M/F DB-9 serial cable (included).