22
|
Installation
UPS Initial Startup
To start up the UPS:
1 Verify that the internal batteries are connected.
2 If an optional EBM is installed, verify that the EBM is connected to the UPS.
3 Verify that the power input to the UPS has adequate upstream overcurrent protection:
Table 1. Minimum Upstream Circuit Breaker Rating
UPS Output Power
120V 208V 230V
500W 15A — 15A
1000W 15A — 15A
1500W (at 100V)
1920W
20A — 15A
The power cord current ratings are listed in Table 2.
Table 2. Power Cord Ratings
Dell UPS Model and Voltage
Power Cord Rating Country Supplied Cord Set
500W and 1000W 100V JIS C8303 to C13 12A Japan Optional
500W and 1000W 120V
NEMA 5-15P to C13 15A North America Yes
CNS 10917-2 to C13 15A Taiwan Optional
C13 to C14 Jumper 12A Japan Optional
NBR 14136 to C13 10A Brazil Optional
NBR 6147 to C13 10A Brazil Optional