Eaton Electrical 3105 UPS Power Supply User Manual


 
UserÊs Manual 350-700VA Rev B
6
Battery connection required before use!
Connecting the Battery:
Principle shown below. For detailed information how to connect, please refer to battery
replacement section.
Installation and Operation:
The following steps explain how to connect and operate the Powerware 3105 UPS.
1. Connect the UPS to a grounded power outlet.
Note
It is recommended that the battery should be charged for minimum 8 hours
to ensure full charge before placing the UPS in service.
2. Plug your computer, monitor or load to be protected into the „Battery Backup &
Surge Protection‰ outlets. (These outlets will provide emergency battery backup
power during power outages as well as protection from surges and spikes.)
Do NOT plug LASER PRINTERS into the „Battery Backup‰ outlets.
Do NOT plug ACCESSORY SURGE strips into the „Battery Backup‰ outlets.
3. Plug your peripheral equipment or non-critical loads (printer, scanner, fax, speaker,
etc.) into the „Surge Protection‰ outlets. (These outlets provide surge and spike
protection only, they will NOT provide battery backup power during a utility power
failure).
4. Connect your computer to the UPS using USB cable provided.
5. With your equipment turned off, switch on the UPS.
6. When the „On/Off‰ LED light is illuminated, turn on the connected equipment.
7. Install Power management software provided with the UPS