BATTERY CABINET INSTALLATION
Eaton 9170
+
UPS (3–18 kVA) User's Guide S 164201393 Rev E www.eaton.com/powerquality
62
Entrance Panel
Battery Cable
Figure 42. UPS Power Entrance Panel
3. Use a pair of pliers to bend the narrow links (1 and 2 in Figure 43)
between the outer edge of the lower breakaway panel and the rear
panel.
4. Use the pliers to bend the entire breakaway panel (at 3 and 4 in
Figure 43) until it breaks away.
1
2
3
4
Figure 43. Breakaway Panel Links
5. Verify all hazardous voltages have been removed from the
backplane by testing with a voltmeter or other test device.