Installation
7
3.0 INSTALLATION
3.1 Preparation
The Liebert PSI XR may be installed in either a tower or rack configuration. Determine the method
that suits the application and proceed.
Decide where to install the Liebert PSI XR. The UPS must be installed indoors in a controlled envi-
ronment. Place it in an area with unrestricted airflow around the unit, away from water, flammable
liquids, gases, corrosives and conductive contaminants (see Figure 6).
Maintain a minimum clearance of 12 inches (305mm) in the front and rear of the UPS. Maintain an
ambient temperature range of 32°F to 104°F (0°C to 40°C).
Figure 6 Placing the Liebert PSI XR
!
CAUTION
The UPS and battery cabinets are heavy (see Table 6 and Table 7). Take proper precautions
when lifting or moving either the UPS or battery cabinets.
32 F (0 C)
Relative humidity
(non-condensing)
104 F (40 C)