Emerson 30-200kVA Power Supply User Manual


 
Battery Installation
37
Figure 22 SENXA0NBCWXX4LF_4x2
W101
W102
W002
W001
W001
W001
W001
W001
W001
W003
W001
W001
W001
W002
W002
W002
W002
W002
W001
W001
W001
W001
W001
W001
W001
W001
W001
W001
W001
W001
W001
W001
W002
W001
W001
W001
W001
W001
W001
W002
W002
W006
W004
W005
W003
Tray in Layer 1
Tray in Layer 3
FRONT VIEW
Tray in Layer 2
SPACE
BCB
Tray in Layer 4
Tray master
Tray master
Layer 1
Tray master
Layer 2
Tray slave
Layer 1
Tray slave
Layer 2
Tray master
Layer 3
Layer 4
BCB
SPACE
Tray master Tray slave
Tray slaveTray master
Tray slave
Tray master
Tray master Tray slave
TO BCB BOX
TO BCB BOX
J1
OUT
GND
Temp. transport
P12
RED
GREEN
BLUE
PP120/180-RED
(Anderson connector)
PP120/180-BLACK
(Anderson connector)
FWP-120A/200A
(Bussmann Fuses)
NOTES:
1. Please refer to BCB BOX user instructions for cable connection.
2. If no internal Control board used, temp. transport cables should be connected
directly to external BCB control board. Meanwhile, the undervoltage release
function for the internal BCB is not needed.
3. Used for: A412/85 F10.