Enterasys Networks 2H252-25R Switch User Manual


 
Completing the Installation
3-12 Installation
3.5 COMPLETING THE INSTALLATION
After installing the 2H252-25R and any optional HSIM or VHSIM, and making the connections to
the network, proceed as follows:
1. Secure the cables by running the cables along the strain-relief bracket and tying them to the
strain-relief bracket using cable ties.
2. The 2H252-25R is now ready to be configured through Local Management. Refer to the
SmartSwitch Series 2E253, 2H252, 2H253 and 2H258 Local Management User’s Guide for
information on how to access and use Local Management.