Fujitsu C120-H007-06EN Computer Drive User Manual


 
C120-H007-05EN i
Preface
1
This manual describes the requirements and concepts of installation and facility
planning that pertain to the setup of SPARC Enterprise and PRIMEQUEST.
Installation and facility planning requires full review with Fujitsu representatives in
charge according to the instructions presented herein.
This manual is intended for site planners preparing for the server system installation.
Use this manual to review server system installation plans or to run and administer the
server system. The reader is assumed to have some knowledge or experience in the
server system installation planning.
Contents and Organization of This Manual
This manual consists of 8 chapters, one appendix, one acronyms and abbreviations
section, and one index as below:
The manual contains general information and precautions required for the server
system installation plans. For information about specific SPARC Enterprise models
and PRIMEQUEST models, refer to the respective Installation Planning Manual.
CHAPTER 1 Installation Planning Overview
This chapter describes general requirements for the server system installation
planning and for the facilities used to house the server systems.
CHAPTER 2 Installation Sites
This chapter describes the recommended sites and structures and the buildings in
which the server systems can be installed, and the structures of the computer rooms.
CHAPTER 3 Equipment Layout
This chapter describes the procedures and precautions to take in laying out the server
system equipment.
CHAPTER 4 Air Conditioning
This chapter describes the available computer room air conditioning methods, along
with their features, conditions of air conditioning, and precautions.
CHAPTER 5 Electromagnetic Environment and Static Electricity
This chapter describes the electromagnetic environmental conditions relevant to
server systems, and electrostatic effects.