Step 1
Check the power source, air conditioning equipment, and location of the installation
site. For details, see the SPARC Enterprise M8000/M9000 Servers Site Planning Guide.
Step 2
Unpack the product package by referencing the SPARC Enterprise M8000/M9000
Servers Unpacking Guide, which comes with the server.
Step 3
Install the main unit. If there is an expansion cabinet to be connected to the SPARC
Enterprise M9000 server, or a power supply cabinet to be mounted in the SPARC
Enterprise M8000 server or SPARC Enterprise M9000 server, connect each of them to
the relevant cabinet. For details, see the
SPARC Enterprise M8000/M9000 Servers
Installation Guide
.
Step 4
Connect the input power cables to the main unit. For details, see the
SPARC
Enterprise M8000/M9000 Servers Installation Guide
.
Step 5
Connect the console to the main unit. For details, see the
SPARC Enterprise M8000/
M9000 Servers Installation Guide
.
Step 6
Turn on the main line switch of the main unit. For details, see the
SPARC Enterprise
M8000/M9000 Servers Installation Guide
.
Step 7
Set necessary information for hardware. For details, see the
SPARC Enterprise M8000/
M9000 Servers Installation Guide
.
Step 8
Turn on the power to the main unit. POST is automatically executed after power-
on. For details, see the
SPARC Enterprise M8000/M9000 Servers Installation Guide
.
Step 9
Set a LAN port on the XSCF unit and connect it. For details, see the
SPARC Enterprise
M8000/M9000 Servers Installation Guide
and the SPARC Enterprise M3000/M4000/
M5000/M8000/M9000 Servers XSCF User’s Guide.
Step 10
If you are installing other peripheral devices in the main unit, proceed to Step 11.
If you are not installing peripheral devices in the main unit, proceed to Step 14.
Step 11
Turn off the power to the main unit. For details, see the
SPARC Enterprise M8000/
M9000 Servers Installation Guide
.
Step 12
Install other peripheral devices. For details, see manuals supplied with each
peripheral device.
Step 13
Turn on the power to the main unit. POST is automatically executed after power-on.
For details, see the
SPARC Enterprise M8000/M9000 Servers Installation Guide
.
Step 14
Check the network connection of domain. For details, see the SPARC Enterprise
M8000/M9000 Servers Installation Guide.
Step 15
Confirm the operation by using Oracle VTS. For details, see the
SPARC Enterprise
M8000/M9000 Servers Installation Guide
and the Oracle VTS User's Guide.
Step 16
Perform the setup required for the operation of the system. For details, see the