Fujitsu MB2142-03 Network Card User Manual


 
17
2.4 Power-on Sequence
2.4 Power-on Sequence
Before turning on the power, ensure that all connections are complete. Then, turn on
the power in the order of the host machine, the main unit, then the target (user
system).
Power-on Sequence
Before turning on the power, ensure that all connections are complete. Then, turn on the power
in the order of the host machine, the main unit, then the target (user system).
To turn on the power, set the power switch on the rear panel of the main unit to "1". Turning on
the main unit also turns on the parallel communications adapter.