Gateway Unmanaged Ethernet Switch Switch User Manual


 
13
Installing the 16- and 24-port switches
www.gateway.com
Installing the 16- and 24-port
switches
Package contents
Open the shipping carton of the switch and carefully unpack its contents. The
carton should contain the following items:
One Gateway 7201-16, 16-port or 7201-24, 24-port 10/100BASE-T Fast
Ethernet switch, or 7401-24, 24-port 10/100/1000BASE-T Gigabit Ethernet
switch, or 7401-24.2, 24-port + 2 10/100/1000BASE-T Gigabit Ethernet
switch.
Accessory pack, including 2 mounting brackets and screws.
Four rubber feet with adhesive backing.
One AC power cord.
This manual.
If any item is missing or damaged, contact Gateway for replacement.
Installing the 16- and 24-port switches without
a rack
When installing the switch on a desktop or shelf, you should attach the rubber
feet included with the switch on the bottom, at each corner of the device. Allow
enough ventilation space between the switch and any other objects in the
vicinity.
Warning Do not place any device on top of the switch or place the
switch on top of any device or object that will block the free
flow of air through the ventilation slots on the sides, top,
and bottom of the switch’s case. In addition, care should
be taken not to locate the switch next to, on top of, or
underneath any device that generates a significant amount
of heat. For the switch to perform at its optimal level, the
switch must have adequate ventilation to prevent the switch
from overheating and becoming damaged.