GE 600 - 1500 VA Power Supply User Manual


 
OPM_NPE_19X_600_1K5_2GB_V030 11 GE DE NetPro 19” 600-1500: User manual 3.0 (GB)
g
GE Digital Energy
Battery replacement procedure
Refer to the label on the battery drawer.
1. Be sure that the transport screws (A, fig. 1) have
been removed.
2. Remove the front panel of the battery compartment.
Use a screw driver or pen as a lever.
3. Remove the two screws that hold the battery drawer.
4. Disconnect the DC connectors. Use a screwdriver
as a lever.
5. Remove battery drawer.
Be careful, heavy weight!
6. Remove clamp (two screws) and replace the
batteries.
7. Reinstall battery clamp, do not pinch or clamp the
wires.
8. Slide in the battery drawer.
9. Connect the DC connectors, a small spark is
normal. Fasten the two screws.
10. Reinstall the front panel.
fig. 9