NOTE: The middle rail separating the two
openings may need to be larger than the 2
(5.1 cm) minimum shown. Always refer to the
individual installation instructions packed with
each product for specific requirements.
Combined Advantium and Wall
Oven Installation:
When installed in combination with a
Monogram single wall oven, use separate
electrical junction boxes.
Refer to the Advantium oven installation
instructions for electrical requirements of
that product.
These connections must be made
by a qualified electrician. All electrical
connections must meet National Electrical
Code or prevailing local codes.
NOTE: Additional clearances may be
required. Check to be sure the oven
supports above the Warming Drawer
do not obstruct the required interior 23 1/2
(59.7 cm) depth and 9 1/4 (23.5 cm) height.
The middle rail separating the openings
may need to be larger than the 2 (5.1 cm)
minimum shown. Always refer to the
individual installation instructions packed
with each product for specific requirements.
Warming Drawer
Combined with Advantium
and Single Oven:
Install a separate 120V, 60Hz, properly
grounded receptacle. See installation
Instructions packed with each product
for specific requirements.
Note: Install the
oven only with
specific models
listed on the label
located on top of
the oven.
Cabinetry
Single Oven Cutout
for Installation Below
a Monogram Advantium
Oven
A7
Single Oven Cutout
for Installation Between
a Monogram Advantium
Oven and a Monogram
Warming Drawer
A8
23 1/2
(59.7 cm)
Min.
Inside
2 (5.1 cm) Min.
45 1/4
(114.9 cm)
27 5/16
(69.2 cm)
Max.
2 (5.1 cm) Min.
45 1/4
(114.9 cm)
1 (2.5 cm) Min.
Above Toekick
23 1/2
(59.7 cm)
Min.
Inside
2 (5.1 cm) Min.
9 1/4
(23.5 cm)
27 5/16
(69.2 cm)
Max.
28 1/2
(72.4 cm)
Per Advantium
Requirement
28 1/2
(72.4 cm)
Per Advantium
Requirement