Hangzhou Hechang Trading S3100-SI Switch User Manual


 
Quick Start
H3C S3100-SI Series Ethernet Switches
Chapter 3 Installation
3-6
II. Installation of an ONU subcard
Step 1: Dismount the dummy panel of an expansion slot of the
switch.
Step 2: Insert the ONU card into the expansion slot to the place.
Step 3: Fix the ONU card firmly with captive screws.
3.3 Connection of Power Cord and Grounding
Wire
3.3.1 Connecting AC Power Cord
I. AC power socket (recommended)
You are recommended to use a mono-phase three-wire power
socket with a neutral point or a multi-function power socket for
computers. The neutral point of the power in your building must be
well grounded. Normally, the neutral point of the power supply system
in your building has already been grounded during the construction
and wiring; but you should make sure this is the fact.
Neutral point
Zero line
Live line
Neutral point
Live line
t
Zero line
Figure 3-6 Recommended AC power socke