3. Disconnect the SCSI cable(s) from the Modular Smart Array 500 system and server(s).
4. Remove the blanking panel from the back of the Modular Smart Array 500 by loosening the
thumbscrew that holds the panel in place X and remove the panel from the back of the unit Y
(see Figure 5).
Figure 5. Removing the blanking panel
2
1
5. Insert the Modular Smart Array Fibre Channel I/O Module (or add the MSA Fabric Switch 2/8)
into the same slot as the active controller
3
, sliding it in as far as it will go and pressing in firmly to
ensure the module is securely seated with the controller (Figure 6).
Figure 6. Inserting the I/O module
3
The term active controller refers to the controller currently installed in the front slot where the new module or
switch should be placed.