IBM 4SB Personal Computer User Manual


 
168 Hardware Maintenance Manual: IBM PC Server/Enterprise Racks
Figure 77. Installing the Rack PDU on the vertical mounting plate
3. If you have a second M/PDU device to install, install it on the vertical mounting
plate with four M3x5 screws that come with the second device.
Figure 78. Installing a second Rack PDU
4. Install the vertical mounting plate
2 in the side of your rack cabinet with four
M6 screws and nuts that come with this option. Make sure that the four-
connector side of the Rack PDU is facing the rear of your rack cabinet, and leave
room between the vertical mounting plate and the rear EIA mounting flanges for
the cable-management bracket
1 .