Lenovo U260 Laptop User Manual


 
52
IdeaPad U260 Hardware Maintenance Manual
Note: Applying labels to the base cover
The new base cover FRU is shipped with a kit containing labels of several
kinds. When you replace the base cover, you need to apply the following
label:
The following labels need to be peeled off from the old base cover, and need
to be put on the new base cover.
a
PRC CODE Label
b
COA Label
c
SIRIM W/L Label
d
SIRIM B/T Label
e
W/L Label US/CA/TW/Israel/Indonesia
f
B/T Label (US/CA/TW/Indonesia)
g
W/L Label (Brazil)
h
B/T Label (Brazil)
For some models, you also need to apply one or two FCC labels. Check the
old base cover; if it has one or two FCC labels, nd duplicates of them in the
label kit and apply them to the new base cover.
For the location of each label, refer to the following gure:
a
b
c
e
g
h
f
d