LevelOne FSW-1609TFX Switch User Manual


 
11
We recommend that you retain the dust cover in case you
need to remove the module for an extended period sometime
in the future.
In FSW-1609/2409TFX, the last port (Port 16/24) and the
100BASE-FX port is really the same port. Do not use both
Port 16/24 and the 100BASE-FX port at the same time.
Rack Mounting
The switch can be mounted in an EIA standard-size, 19-inch
rack, which can be placed in a wiring closet with other
equipment. Attach the mounting brackets at the switch’s
front panel (one on each side), and secure them with the
provided screws.