7
Before installation, re-installation, or troubleshooting
• Stop the application
• Switch off the power supply and pull out the mains plug.
• Relieve the application of any loads, which may be released during the work.
Before start-up
• Make sure that the system has been installed as instructed in the User Manual.
• Make sure that the voltage of the control box is correct before the system is
connected to the mains.
• System connection. The individual parts must be connected before the control
box is connected to the mains.
During operation
• Ensure that the cables are not damaged.
• Unplug the mains cable on mobile equipment before it is moved.
Information on the MJB
The MJB Modular Junction Box is designed for use together with OpenBus™
control boxes.
The MJB makes it possible to connect multiple handsets, attendant controls or it
makes it possible to use the MJB as a control unit for 3
rd
party products as Out of
Bed detection, USB charger, Under Bed Light etc.
LINAK A/S delivers only the OpenBus system and is not responsible for any
products other than LINAK products (i.e. products from 3
rd
party suppliers) or
the compliance of such products with the LINAK OpenBus
TM
system.