9-19
24. Fix the Screw. <N7>
25. Attach the TOP Screws.
Note:
Tighten the Screws in the numbered order (No1 to No8).
Tighten the Screws in the numbered order (No1 to No6).
Screws <N5>: DRQT26+D4FKL
Screws <N7>: DRSB26+10HKL
Screws <N11>: DFHE5025XA
Screws <N16>: DRQT26+E5FKL
Screws <N17>: DRQT26+E6FKL
Screws <N18>: DRSB26+8FKL
Screws <N21>: DXQT2+E12FNL
<N7>
TOP Screw Sheet
Connector
(CN17)
Connector
(CN27)