Matsushita CF-W4GWCZZ Laptop User Manual


 
Putting of LCD Damper(C)
Rib edge match of LCD Front Case
0
1mm
Rib application putting of LCD Front Case
0
1mm
LCD Damper(C)
Plinth externals match
0
1mm
Rib application putting of LCD Front Case
0
1mm
Conductive Cloth is wrapped
(Leave the half)
75
5mm
LCD Cable (Inverter)
Putting of Conductive Cloth of LCD Cable
The Cable is processed under the shaft .
Note:It is confirmed that the cable does not narrow
between cabinets.
Drawing out specification of LCD Cable
0 1mm
0
1mm
Put the Conductive Cloth
The cable is processed
to the ditch
Processing cable to under point
hanging part
Processing the cable to
the DC-IN Jack Holder
LCD cable processing 1
LCD Cable processing 2
Process the LCD Cable (2) such as DC-IN Jack Holders,
after process the Conductive Cloth of the LCD cable puts
as shown in the figure below.
Connector connection specification
The order of connecting connector
Inverter Cable
LCD Cable
DC-IN Jack Holder
3-3