14
Figure 3-1. RJ-45 Connections
Equipment Checklist
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
Package Contents
• Stackable Fast Ethernet Switch (MR2228-S2C)
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and eight screws for attaching the
brackets to the switch
• Power Cord—either US, Continental Europe or UK
• RS-232 console cable
• This Installation Guide
• Management Guide
Optional Rack-Mounting Equipment
If you plan to rack-mount the switch, be sure to have the following equipment
available:
• Four mounting screws for each device you plan to install in a rack—these are
not included
• A screwdriver (Phillips or flathead, depending on the type of screws used)
Mounting
This switch can be mounted in a standard 19-inch equipment rack or on a desktop
or shelf. Mounting instructions for each type of site follow.