POSIFLEX Business Machines TP/LT- 5800 Computer Monitor User Manual


 
Part 9
will look like the right picture.
Route the VGA through the
cable exit of the base stand to
the main unit. Connect the
attached power adaptor for its
power source.
ROUTING THE CABLES
Place all the cables required for connections to the
main unit except those for the integrated attachment
through the front part inside the stand assembly. Be sure
not to damage any cable during this operation.
Now, turn the adjustable stand assembly back to normal orientation
and arrange all cables to come out of the area for mounting main unit from the
bottom edge for ease of later operation.
PREPARING THE MAIN UNIT
On the back of the main unit, there are 4 matching pegs and a service
window. Push open the service window in the direction as indicated in the
picture, one can find a button cell battery socket and several jumpers for some
technical settings. Please note that only those qualified technicians may adjust
in the service window with information from Posiflex and the contents in the
service window may change without notice as time develops.
This battery socket accepts a 3 V button cell Lithium battery (CR2032)
required to support the system real time clock. The used up batteries must be
recycled and disposed of under guidance of local legislations. The jumpers in
this window are designated for VGA port and COM port power supply
function. Please consult your dealer for technical support on setup of these
jumpers. A new Lithium battery can support the system RTC for about 3 years.
CAUTION
Risk Of Explosion If Battery Is Replaced By An Incorrect Type
Dispose Of Used Batteries According To Local Regulations
Route Cables through Front Part
Connect this End to Main Unit
Service Window
Push Open To
The Right
4 Matching
Pegs
Li Battery