19
INSTALLER GUIDE
UNO-S2 Keypad Location
Installation Location
The best infrared remote performance is
achieved with the keypad installed away
from any direct sunlight, plasma TV, and
low voltage lighting controls. Also consid-
er convenience when choosing a location.
Choose a place that is easily seen from
the position where a person is most
likely to be located.
Check whether or not you can route the
wire to the location you have chosen.
Keypad Installation
To install a double-gang keypad, you will
need to use a 36 ci UL/CSA approved
plastic double-gang electrical box.
Route CAT-5 wire to the junction box from
the CAV6.6/CAM6.6.
Use the supplied 110 punchdown tool
to connect each wire to its correspon-
ding color labeled on the punchdown
terminal (See page 12 for details).
Ensure jumper setting on the keypad is
in the “RUN” position.
Mount the keypad in the electrical box
and attach the cover plate. Repeat the
steps until all keypads are installed.