![](http://pdfasset.owneriq.net/0/57/0577c8ef-eca2-4839-bbfe-b1f7602904a9/0577c8ef-eca2-4839-bbfe-b1f7602904a9-bg35.png)
Chapter 2 Installing the Adapter 19
3. Press the Attention button.
The power LED should blink about 10 times then remain a steady green light.
▼ To Verify the ExpressModule Installation
1. Use the cfgadm command to verify the ExpressModule installation:
If the ExpressModule is properly installed and connected, you should see output
similar to the following:
2. Use the dladm show-dev command to verify that the link is up.
You should see output similar to the following:
# cfgadm
Ap_Id Type Receptacle Occupant Condition
pcie5 etherne/hp connected configured ok
# dladm show-dev
e1000g2 link: up speed: 1000 Mbps duplex: full
e1000g3 link: up speed: 1000 Mbps duplex: full