Transition Networks SM24-100SFP-AH Switch User Manual


 
3-2
Installing the Switch
3
Optional Rack-Mounting Equipment
If you plan to rack-mount the switch, be sure to have the following equipment
available:
Four mounting screws for each device you plan to install in a rack—these are not
included
A screwdriver (Phillips or flathead, depending on the type of screws used)
Mounting
The switch units can be mounted in a standard 19-inch equipment rack or on a
desktop or shelf. Mounting instructions for each type of site follow.
Rack Mounting
Before rack mounting the switch, pay particular attention to the following factors:
Temperature: Since the temperature within a rack assembly may be higher than
the ambient room temperature, check that the rack-environment temperature is
within the specified operating temperature range. (See page D-2.)
Mechanical Loading: Do not place any equipment on top of a rack-mounted unit.
Circuit Overloading: Be sure that the supply circuit to the rack assembly is not
overloaded.
Grounding: Rack-mounted equipment should be properly grounded. Particular
attention should be given to supply connections other than direct connections to
the mains.
To rack-mount devices:
1. Attach the brackets to the device using the screws provided in the Bracket
Mounting Kit.
Figure 3-1. Attaching the Brackets