3Com Webcache 1000 (3C16115) Switch User Manual


 
The Power-up Sequence 31
7 Slide the rack-mounting brackets on the sides of the Webcache into the
rack-mounting rails.
8 Secure the front of the Webcache to the rack with the captive
thumbscrews, as shown in Figure 8.
Figure 8 Attaching the Webcache to the Rack
9 Ensure that the ventilation holes in the Webcache are not obstructed.
The Power-up
Sequence
The following sections describe how to get your Webcache powered-up
and ready for operation.
Powering-up the
Webcache
Use the following sequence of steps to power-up the Webcache:
1 Plug the power cord into the power socket at the rear of the Webcache.
2 Plug the other end of the power cord into your power outlet.
3 The Webcache automatically powers-up, which takes approximately
60-90 seconds. During power-up all of the LEDs light and the Power/Self
test LED flashes green. When the Webcache has powered-up and is
operating normally, the Power/Self test LED changes to non-flashing
green.