Acer G5450 Series Personal Computer User Manual


 
117
Rack installation information
The Altos G5450 server system can also be mounted in a rack-model
position. A rack mount kit is available for customers who want to
convert a tower-mounted system to rack-model design. To purchase a
rack mount kit, contact your local Acer representative or order directly
from http://www.acer.com/
.
Rack installation precautions
Follow the rack manufacturer's safety and installation instructions for
proper rack installation.
The following additional rack safety installation measures should be
considered:
Anchor the equipment rack
The equipment rack must be anchored to an unmovable suitable
support to prevent the rack from falling over when one or more
systems are fully extended out of the rack assembly. You must also
consider the weight of any other devices installed in the rack
assembly. The equipment rack must be installed according to the
manufacturer's instructions.
Main AC power disconnect
You are responsible for installing an AC power disconnection for
the entire rack unit. This main disconnection must be readily
accessible, and it must be labeled as controlling power to the
entire unit, not just to the system(s).
Earth ground the rack installation
To avoid the potential for an electrical shock hazard, the rack
assembly itself must be suitably earth grounded, according to your
local regional electrical codes. This typically will require the rack to
have its own separate earth ground. We recommend you consult
your local approved electrician.