Allied Telesis 613-001480 Switch User Manual


 
AT-S94 Version 3.0.0.41 Software Release Notes
PN 613-001480 Rev A 15 Allied Telesis, Inc.
14. Before rebooting the stand alone switch or stack, you must change the active image,
including each slave switch in the stack. To check the active image for each switch use the
following command.
Show bootvar
15. The resulting display will tell you which image is active on each switch. Depending on your
configuration, you can now issue one of the following commands, substituting x and y from
the Show bootvar command:
For a stand alone switch -
Boot sys image-y
For each switch in a stack -
Boot sys unit x image-y
This command will switch the active image for next reboot.
16. Reboot the device with the command:
reload
This command will cause the switch to reboot. By the end of the reboot process, the final
code drop will be running.
17. Download saved configuration (if needed) to the device.
Note
In case of a stack both the interim version and the final version should be downloaded to
ALL the units in the stack at the same time
Note
Following this procedure and uploading the interim code drop is required only once. Any
future S/W upgrades will not require the additional upload of the interim code drop.