Allied Telesis AT-9400 Switch User Manual


 
43
Chapter 2
Installing the Switch
This chapter contains the installation procedures for the switch. The
chapter contains the following sections:
“Reviewing Safety Precautions” on page 44
“Selecting a Site” on page 47
“Twisted Pair and Fiber Optic Cable Specifications” on page 48
“Unpacking the Switch” on page 50
“Installing the Power Cord Retaining Clip (AC Switches Only)” on
page 51
“Installing the Switch in a Rack” on page 52
“Installing Optional Transceivers” on page 54
“Cabling the Twisted Pair or Fiber Optic Ports” on page 59
“Applying AC Power” on page 60
“Starting a Local Management Session” on page 62
“Warranty Registration” on page 64