American Power Conversion 240-320kW400V Power Supply User Manual


 
12 User Guide APC Silcon 240-320kW 400V UPS
990-4057
Stop/Start UPS and Operating the External Service Bypass
2.6 Operating the External Service Bypass Switch (parallel systems)
2.6.1 Bypassing the Parallel UPS System (All UPSs)
Service
bypass
switch
Load
Mains
APC Silcon
UPS
APC Silcon
UPS
CAUTION!
Do not leave UPS out of service for more than 48 hours. Refer to section 2.3 Stop (for complete
power down).