Chapter 2 Installation and Maintenance
Only trained service personnel should install and maintain the Power Supply.
Prior to installing the enclosure AC line voltage must be routed to the installation site. Local, state,
federal and/or National Electric Code (NEC) regulations regarding location, permits and electrical
wiring must be adhered to.
Do not operate the Power Supply where the temperature and humidity are outside the specified
limits. See Specifications in this manual.
Models Supported
CTEG4M
Encl, TSP (2), 4 Batteries, Generator Control Module
CTEG4M8M
Encl, TSP (1), 8 Batteries, Generator Interface
CTEG4M12B
Encl, 12 Batteries
Unpacking
Inspect the unit upon receipt. Notify the carrier if there is damage.
The packaging is recyclable; save it for reuse or dispose of it properly.
Check the package contents. The package contains the enclosure, battery cables, associated
hardware, and product documentation.
CTEG4M: (9 cables) 15” black battery jumpers (3), 28” black (1), 48” black (1),
15” red (1), 29” red (2), 30” red (1)
CTEG4M8M: (12 cables) 15” black battery jumpers (4), 26” black (1), 27” black (1), 28” black
(1), 56” black (1), 15” red (1), 25” red (1), 34” red (1), 35” red (1)
CTEG4M12B: (17 cables) 15” black battery jumpers (9), 30” black (2), 80” black (1),
18” red (1), 30” red (2), 45” red (2)
CTEG4M when wired with
the CTEG12B: (8 cables)
15” black battery jumpers (3), 28” black (1), 48” black (1),
19” red (1), 29” red, 45” red (1)