APC SMX48RMBP2U Power Supply User Manual


 
11Smart-UPS X 750/1000/1500 VA 120/230 Vac Rack-Mount 2U
Customize the controllable outlet groups and the UPS outlets
Use the Control menus to change the controllable outlet groups and the UPS outlet settings.
Function Factory Default Options Description
Name String Outlet
Group
Outlet Group 1
Edit these names using an external interface, such as the Network
Management Card Web interface.
UPS Name String UPS Outlets
Turn On Delay 0 sec
Set the value in
seconds
The amount of time the UPS or Controllable Outlet
Group will wait between receiving the command to
turn on and the actual startup.
Turn Off Delay 0 sec
Set the value in
seconds
The amount of time that the UPS or Controllable
Outlet Group will wait between receiving the
command to turn off and the actual shut down.
Reboot Duration 4 sec
Set the value in
seconds
The amount of time that the UPS or Controllable
Outlet Group must remain off before it will restart.
Minimum
Return Time
0 sec
Set the value in
seconds
The amount of battery runtime that must be available
before the UPS or Controllable Outlet Group will
turn on.
Load Shed
On Battery
Disabled
• Shutdown with
Delay
• Shutdown
immediately
• Turn off
immediately
• Turn off with delay
Disabled
When the unit switches to battery power, the UPS
can disconnect power to the Controllable Outlet
Groups to save runtime.
Configure this delay time, use the
LOAD SHED TIME
WHEN ON BATTERY setting.
Load Shed Time when
On Battery
Disabled
Set the value in
seconds
The amount of time the outlets will function on
battery power before they will turn off.
Load Shed On
Runtime
Disabled
• Shutdown with
delay
• Shutdown
immediately
• Turn off
immediately
• Turn off with delay
Disabled
When the battery runtime falls below the specified
value, the Controllable Outlet Group will turn off.
Configure this time using the
LOAD SHED RUNTIME
REMAINING setting.
Load Shed On
Runtime Remaining
Disabled
Set the value in
seconds
When the remaining runtime reaches this level, the
Controllable Outlet Group will turn off.
Load Shed on
Overload
Disabled
Disabled
• Enabled
In the event of an overload (greater than 100%
output), the Controllable Outlet Group will
immediately turn off to conserve power for critical
loads. The Controllable Outlet Group will only turn
on again with a manual command.