APC SMX48RMBP2U Power Supply User Manual


 
Smart-UPS X 750/1000/1500 VA 120/230 Vac Rack-Mount 2U4
Operation
Connect Equipment to the UPS
Note: The UPS will charge to 90% capacity in the first three hours of normal operation. Do not
expect full battery runtime capability during this initial charge period.
1. Connect equipment to the outlets on the rear panel of the UPS.
2. Connect the UPS to the building utility power.
Always connect the UPS to a two pole, three wire, grounded source.
3. To use the UPS as a master
ON/OFF switch, turn on all the equipment that is connected to the UPS.
4. Press the
ON/OFF button on the front panel of the UPS to turn on the UPS and all connected equipment.
5. See “Controllable Outlet Groups” on page 8 for information on how to use the Controllable Outlet Groups.
Basic Connectors
CAUTION
RISK OF EQUIPMENT DAMAGE
Adhere to all local and national electrical codes.
Wiring should be performed by qualified electrician.
Always connect the UPS to a grounded outlet.
Failure to follow these instructions can result in equipment damage
Serial port: Connect to a computer to use power management software.
USB port: Connect to a computer to use power management software.
Note: Serial and USB communication can not be used simultaneously.
External Battery Pack connector: Connect external battery packs to provide extended runtime
during power outages. The UPS can support up to five external battery packs.
Ground Screw: The UPS features a ground screw for connecting the ground lead on surge
suppression devices such as a telephone and network line protectors. When connecting a ground
cable, disconnect the UPS from utility power.
su0439a