20
Getting Started Guide
4. After all units have had stacking enabled, connect the console
to the first unit (the Master unit).
5. Power cycle the whole stack, or, if the units are to be powered
up separately, power the Master last.
6. Go to the Master’s Stack Management menu and type s to be-
gin the automatic formation of the stack.
7. After the stack is formed, configuration and operation of the
stack can begin (see the User’s Manual for information on con-
figuring the switch(es) for operation.).